Below are frequently asked questions. These will be added to as additional queries are raised during the development process.

Frequently Asked Questions

What is North Moor Wind Farm?

North Moor Wind Farm is a proposed onshore wind farm on farmland west of Scunthorpe, near Belton, Ealand and Crowle.

Wind2 is developing proposals for up to nine turbines, each up to 230 metres to blade tip with an expected output of 65MW. The project is at an early stage, with environmental surveys and design work ongoing.

Has a planning application been submitted?

No. We are at the scoping stage, which asks North Lincolnshire Council to advise on what the Environmental Impact Assessment should cover. Scoping does not grant planning permission or approve the proposed layout.

We currently expect to submit a planning application towards the end of 2027.

What planning policies will the project be assessed?

The project will be assessed under the (planning policy), further information on the criteria can be viewed via the following link: https://www.gov.uk/guidance/na...

How tall would the turbines be?

We are assessing turbines up to 230 metres, measured from ground level to the tip of a blade at its highest point.

This is the maximum height being assessed. The final turbine dimensions and layout have not yet been determined.

Why are turbines so tall?

Taller turbines reach stronger, more consistent winds, so each turbine generates more electricity. Their scale also affects how they are seen in the landscape.

The landscape and visual assessment will consider how they would appear, including alongside other wind farms in the area such as Keadby Wind Farm.

How close would the turbines be to my home?

The proposed turbine positions are shown on the scoping layout [Link to Map to be inserted], but they are not final.

The assessments will consider nearby homes, including potential noise and visual effects. Please contact us if you would like help identifying your property in relation to the proposals.

Will I be able to see the turbines?

The turbines would likely be visible from the surrounding area. What you would see from a particular location depends on distance, the final layout, buildings, vegetation, landform and other factors.

The landscape and visual assessment will look at views from representative locations, and visualisations will be prepared to show how the proposals could look.

How tall will the North Moor Wind Farm turbines be compared to Keadby Wind Farm?

The Keadby Wind Farm turbines are approximately 125 metres to maximum tip height. Whilst the wind turbines for North Moor Wind Farm are considerably taller, the project, if approved will produce roughly the same output with just 9 wind turbines (with only around a quarter of the number of wind turbines as Keadby) based on the current indicative scoping layout, reducing the overall project’s impact.

Would the wind farm be noisy?

Wind turbines make some sound when operating. Specialist noise consultants will measure existing background noise and assess predicted noise levels at nearby properties, including the combined effect with other wind farms and other environmental factors. The findings will inform the design and any measures needed to manage noise.

We cannot confirm the effect at individual properties until this work has been completed, but this information will be made publicly available at a later stage once the layout is finalised.

Will the turbines cause shadow flicker?

Shadow flicker can occur when sunlight passes through rotating turbine blades and casts a moving shadow through a window.

The assessment will consider whether nearby properties could be affected and whether measures would be needed to prevent or manage it.

Will the turbines have lights on them?

Aviation lighting is expected to be required due to the proposed turbine height.

We will seek to agree a reduced lighting arrangement with the aviation authorities, and the potential visual effects of lighting will be considered in the environmental assessment.

How will you assess effects on wildlife?

Specialist surveys are ongoing, and are recording birds, habitats and other wildlife on the site and in the surrounding area.

The assessment will consider potential effects during construction, operation, and decommissioning, including on nearby protected sites. The findings will inform turbine positioning and measures to avoid or reduce harm.

Opportunities to improve habitats will also be explored.

What about the Isle of Axholme’s historic landscape?

We recognise the importance of the Isle of Axholme’s historic landscape and the buildings and places that give it its character.

The heritage assessment will consider potential effects on the historic landscape, archaeology, listed buildings and their settings.

Specialist engagement with North Lincolnshire Council and Historic England will inform this work.

Could the development increase flood risk?

Flood risk and drainage are important considerations for the project.

A Flood Risk Assessment will consider how the wind farm could be designed to remain safe in a flood and avoid increasing flood risk elsewhere. This work will inform the location of infrastructure and the drainage proposals, with input from the relevant authorities.

Would farming the land continue?

The intention is for farming to continue across land not required for the wind farm’s infrastructure.

The full site area does not represent the amount of farmland that would be taken out of agricultural use. Land would be needed for turbine foundations, access tracks, working areas and electrical infrastructure. The extent of permanent and temporary land take will become clearer as the design develops.

How would turbines and construction materials reach the site?

The proposed site access is from the A18, using an existing access.

Delivery routes for turbine components and construction materials are still being assessed. A transport assessment will consider construction traffic, road conditions and any measures to manage disruption.

We will consult on access and delivery arrangements as they are developed. Information about local road use, such as agricultural traffic and access to homes and businesses, would be welcome.

Is North Moor Wind Farm part of the proposed North Humber to High Marnham electricity line?

No. North Moor Wind Farm and National Grid’s North Humber to High Marnham proposal are separate projects.

Would there be benefits for the local community?

A community benefit fund will be provided to ensure the local community shares in the benefits of hosting renewables infrastructure. . The amount and arrangements have not yet been confirmed.

Consultation will explore local priorities and how the fund could operate.

Other potential benefits to be explored, include local electricity bill discounts, shared ownership and opportunities for local businesses. None of these additional measures are confirmed at this stage.

What will you consult the community on?

Consultation will cover the developing turbine layout and associated infrastructure, including access routes, the proposed community benefit fund, habitat management and any potential effects on public rights of way.

We will also seek local information needed for the assessments.

At each stage, we will explain the proposals being considered, what remains undecided and any technical or environmental constraints.

Can I comment on the proposed access route?

Yes. The current proposal is to access the site from the A18 using the existing access serving North Moor Farm.

As access and delivery arrangements are developed, we will present them for consultation. Information about local road conditions, traffic, access to homes and businesses, and other regular road uses will help inform the transport assessment and traffic management proposals.

What will consultation on the community benefit fund involve?

Consultation will explore local priorities and how the proposed fund could operate. This could include the types of projects it could support, how applications could be considered and how local people could be involved in its management.

The amount and detailed arrangements have not yet been confirmed.

Will you consult on habitat management?

Yes, consultation will provide an opportunity to identify relevant local conservation projects, habitat connections and practical considerations for longer-term management.

Who would decide the planning application?

Any planning application would be submitted to North Lincolnshire Council for determination.

The Council would consider the application, the environmental information, planning policy and the comments received through its consultation process. Comments made to the project team do not constitute formal representations to any forthcoming planning application.

How will the information and feedback provided during consultation be used?

Information will be considered by the relevant members of the project and assessment teams.

As the scheme develops, consultation materials will explain changes to the proposals and the reasons for them.

How can I take part or comment?

You can review information on this website, attend the planned public exhibitions or contact the project team by email, post or the online “Contact Us” form.

Comments sent to the project team are not formal representations to North Lincolnshire Council. Once a planning application has been submitted, you may wish to comment directly to North Lincolnshire Council. A link to the planning portal will be provided here following submission of the planning application, which will contain the application documentation and information about how you can make a formal representation to the Council.

How will the information I provide be managed?

We will handle your personal information securely and in accordance with UK GDPR, using it to respond to your enquiry and inform the project’s development, as explained in our Privacy Notice.